冷再生機(jī)出租廠家施工的準(zhǔn)備工作
來(lái)源:http://m.gzmilo.com/ 日期:2022-08-24 發(fā)布人:
廠家在道路施工前要做好充分的準(zhǔn)備工作,才能保障整個(gè)施工過(guò)程的順利進(jìn)行,需要做好哪些準(zhǔn)備工作呢?冷再生機(jī)出租廠家為您講解。
The manufacturer shall make sufficient preparations before road construction to ensure the smooth progress of the whole construction process. What preparations should be made? The rental manufacturer of cold regeneration machine will explain it to you.
1、要建立嚴(yán)謹(jǐn)、規(guī)范的內(nèi)部約束、考核、激勵(lì)機(jī)制,用制度管人,用規(guī)章管理工程。
1. It is necessary to establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with regulations.
2、要補(bǔ)充調(diào)查工程沿線影響施工的因素,標(biāo)注出平面位置圖,并進(jìn)行、論證,寫(xiě)出調(diào)查報(bào)告,作為修訂施工方案、編制施工控制預(yù)算的依據(jù)。
2. The factors affecting construction along the project shall be supplemented and investigated, and the plane position map shall be marked, and the investigation report shall be made and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設(shè)計(jì)意圖,澄清圖紙中的問(wèn)題,恢復(fù)定線和施工放樣。對(duì)所有控制點(diǎn)進(jìn)行加密、保護(hù)、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場(chǎng)調(diào)研認(rèn)真編制施工控制預(yù)算,作為控制支出、進(jìn)行成本預(yù)測(cè)分析、經(jīng)濟(jì)核算以及統(tǒng)計(jì)工程進(jìn)度的依據(jù)。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.


5、進(jìn)行業(yè)務(wù)、技術(shù)培訓(xùn)和技術(shù)交底,使相關(guān)人員對(duì)工程的技術(shù)標(biāo)準(zhǔn)、操作規(guī)程、質(zhì)量控制、資料整理有的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地試驗(yàn)室,并申請(qǐng)臨時(shí)資質(zhì)。對(duì)施工中擬使用的各種原材料取樣試驗(yàn),建立相關(guān)技術(shù)參數(shù)的數(shù)據(jù)庫(kù)。
6. Establish site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7、繪制關(guān)鍵工序施工工藝流程圖和試驗(yàn)操作規(guī)程、質(zhì)量檢查評(píng)定、計(jì)量支付、設(shè)計(jì)變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident treatment and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術(shù)標(biāo)準(zhǔn)、機(jī)械設(shè)備能力、材料供應(yīng)、自然條件等進(jìn)行綜合分析,選擇佳施工方案,完善施工組織設(shè)計(jì)。
8. Conduct comprehensive analysis according to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., select the best construction scheme and improve the construction organization design.
為了各方面的著想,以上八點(diǎn)準(zhǔn)備工作希望您能夠好好了解,更多內(nèi)容就來(lái)我們網(wǎng)站http://m.gzmilo.com咨詢吧!
For the sake of safety in all aspects, I hope you can have a good understanding of the above eight preparations. Come to our website for more information http://m.gzmilo.com Consult!
閱讀/ Recommended reading
- 水泥撒布車的知識(shí)特點(diǎn)介紹 2025-02-28
- 冷再生機(jī)是一種、多用途的道路施工 2025-02-25
- 冷再生機(jī):土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機(jī)液壓油的作用 2025-02-17
冷再生機(jī)操作規(guī)程
[2018-08-23]
冷再生機(jī)的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機(jī)操作規(guī)程的詳細(xì)內(nèi)容: The safety operating procedures for...