冷再生機(jī)在工作過程中,每次停車,即使只需要幾分鐘就可以更換罐車,也會(huì)對整個(gè)接縫處回收材料的均勻性造成嚴(yán)重影響。因此,冷再生機(jī)租賃廠家提醒,在施工中應(yīng)盡量減少停工。在不可避免的情況下,應(yīng)仔細(xì)處理形成的橫向接縫。
During the working process of the cold regenerator, even if the tank car can be replaced within a few minutes after each stop, it will also have a serious impact on the uniformity of the recycled material at the entire joint. Therefore, the cold regenerator leasing manufacturer reminded that shutdown should be minimized during construction. Where unavoidable, the transverse joints formed shall be carefully treated.
1。當(dāng)臨時(shí)停工后重新開工時(shí),整個(gè)再生裝置應(yīng)后退1.5-2米再生材料,以確保所有材料在開工后得到處理。
1。 When restarting after temporary shutdown, the whole regeneration device shall be retreated 1.5-2 meters to the recycled material to ensure that all materials are treated after starting.
2。后一個(gè)工段應(yīng)預(yù)留4-6米的實(shí)時(shí)壓路,下一工段不碾壓。
2。 4-6 meters of real-time rolling shall be reserved for the next section, and the next section shall not be rolled.
3。當(dāng)冷再生租賃后開始工作時(shí),應(yīng)將轉(zhuǎn)子切割到再生層的底部,以破壞再生材料。前進(jìn)速度為0,使松散再生料混合不均勻。因此,人工翻身后須對坑進(jìn)行平整。
3。 When starting work after the cold regeneration lease, the rotor should be cut to the bottom of the regeneration layer to destroy the regeneration material. The forward speed is 0, so that the loose recycled material is mixed unevenly. Therefore, the pit must be leveled after manual turnover.


再生層穩(wěn)定后,再生料基本處于穩(wěn)定狀態(tài),但不能完全再生機(jī)輪軌。此時(shí)輪距深度約為0.5-1厘米。
After the regeneration layer is stabilized, the recycled material is basically in a stable state, but the wheel rail of the regeneration machine cannot be completely eliminated. At this time, the track depth is about 0.5-1 cm.
當(dāng)兩段再生完成且全部穩(wěn)定后,用平地機(jī)進(jìn)行平整。一次調(diào)平的目的是一和二塊右側(cè)的三排輪軌。二次平整主要是在刮料機(jī)前均勻攤鋪再生料,同時(shí)考慮再生層的水平和垂直坡度。后對整個(gè)作業(yè)段進(jìn)行平整。
When the two stages of regeneration are completed and all are stable, use a grader to level them. The purpose of primary leveling is to eliminate one and two right three-row wheel tracks. The secondary leveling is mainly to evenly spread the recycled material in front of the scraper, taking into account the horizontal and vertical slope of the recycled layer. After that, the whole operation section shall be leveled.
再生機(jī)的工作寬度一般小于再生路面的工作寬度。因此,整個(gè)道路的再生需要多次操作,導(dǎo)致幾個(gè)相鄰工作面之間出現(xiàn)縱向接縫。
The working width of the regenerator is generally smaller than the working width of the recycled pavement. Therefore, the regeneration of the entire road requires multiple operations, resulting in longitudinal joints between several adjacent working faces.
一般來說,相鄰工作面之間的小重疊為10cm,以確保縱向接縫處回收材料的連續(xù)性,同時(shí)避免相鄰工作面之間存在不回收的夾帶。
Generally speaking, the small overlap between adjacent working faces is 10cm to ensure the continuity of recycled materials at the longitudinal joints and to avoid non-recycled entrainment between adjacent working faces.
另外,在選擇冷再生機(jī)的時(shí)候,要與冷再生租賃廠家簽訂相應(yīng)的合同,這一點(diǎn)是非常重要的。您要注意一下合同的雙方,甲方與乙方都應(yīng)該是明確的租賃人,應(yīng)該明確雙方的責(zé)任和義務(wù)。更多相關(guān)該設(shè)備租賃的事項(xiàng)就來我們網(wǎng)站做http://m.gzmilo.com咨詢吧!
In addition, when selecting the cold regeneration machine, it is very important to sign the corresponding contract with the cold regeneration leasing manufacturer. You should pay attention to both parties of the contract. Both Party A and Party B should be clear tenants, and the responsibilities and obligations of both parties should be clear. Come to our website for more matters related to the equipment leasing http://m.gzmilo.com Ask!
閱讀/ Recommended reading
- 水泥撒布車的知識(shí)特點(diǎn)介紹 2025-02-28
- 冷再生機(jī)是一種、多用途的道路施工 2025-02-25
- 冷再生機(jī):土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機(jī)液壓油的作用 2025-02-17
冷再生機(jī)操作規(guī)程
[2018-08-23]
冷再生機(jī)的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機(jī)操作規(guī)程的詳細(xì)內(nèi)容: The safety operating procedures for...