三级片在线观看网站,日韩美女操逼,在线播放国产色视频在线,女人毛片a毛片久久人人

冷再生施工和機械租賃業(yè)務
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務熱線

18264104888

新聞中心

首頁>>新聞中心冷再生機的整形與碾壓操作事項
新聞中心
聯(lián)系我們
山東途暢路橋工程有限公司

聯(lián)系人:石總

電話:18264104888

地址:山東省濟南市槐蔭區(qū)經一路273號群盛華城

冷再生機的整形與碾壓操作事項

來源:http://m.gzmilo.com/ 日期:2023-02-17 發(fā)布人:
冷再生機將再生混合料拌和均勻并由振動壓路機穩(wěn)壓一遍后,應立即用平地機初步整形。在直線和不設平曲線段,平地機由路肩向路中間刮平;在設的平曲線段,平地機由內側向外側進行刮平。
After the cold regenerator mixes the recycled mixture evenly and stabilizes it once by the vibratory roller, the grader shall be used immediately for preliminary shaping. In straight and non-flat curve sections, the grader shall level from the shoulder to the middle of the road; In the set flat curve section, the grader shall level from the inside to the outside.
必要時再返回刮一遍,對于局部低洼處,應用鐵鎬將表層5cm以上耙松,并用新拌的混合料進行找平。整形的過程中應及時粗細料離析現象。既由人工配合機械把大塊沒有破碎掉的舊路料掉。整形時應將高處料直接刮出路外,不應形成薄層貼補現象。
If necessary, go back and scrape again. For local low-lying areas, use an iron pick to loosen the surface layer more than 5cm, and use the freshly mixed mixture for leveling. The segregation of coarse and fine materials shall be eliminated in time during the shaping process. The large pieces of old road materials that have not been broken shall be removed manually and mechanically. During shaping, the high materials should be directly scraped out of the way, and there should be no thin layer of patching.
冷再生機租賃廠家提醒您,在初平完成后,由振動壓路機高幅/低頻穩(wěn)壓一遍,然后由測量工按照質量控制要求分左、中、右三點放樣控制標高和橫坡度(直線段20米1點,彎道10米一點),進行細致找平,達到調拱度、調坡度的目的。保證平整度、橫坡度符合設計要求。
The cold recycling machine rental manufacturer reminds you that after the initial leveling is completed, the vibratory roller will stabilize the high amplitude/low frequency voltage once, and then the surveyor will set out and control the elevation and cross slope at three points, namely, the left, the middle and the right according to the quality control requirements (20 meters and 1 point for the straight section and 10 meters and 1 point for the curve), and carry out fine leveling to achieve the purpose of camber and slope adjustment. Ensure that the flatness and cross slope meet the design requirements.
冷再生機租賃
冷再生機施工過程中要堅持“寧刮不補”的原則,如果要補料的話,當確定要補5cm以上的混合料,補料的時候,需在新補料中多摻水泥并保證含水量,以確保粘結性,碾壓的時候能不松散不起皮。
During the construction of the cold recycling machine, the principle of "scraping rather than patching" should be adhered to. If it is necessary to make up, when it is determined to make up more than 5cm of mixture, it is necessary to add more cement and ensure the water content in the new material to ensure the cohesiveness, and it is not loose and peeling when rolling.
做終平工作時,一定要特別小心,確保整個表面刮平,使其縱向順適,路拱和符合設計要求。不要在低洼處落下刀片,須將局部高出部分刮除并掃出路外,因為這些料與下層料之間是沒有粘結力的,碾壓的時候容易造成起皮壓不住的現象。終平應仔細進行,對于局部低洼之處,不再進行找補,可留待鋪筑瀝青面層時處理。
During the final leveling work, special care must be taken to ensure that the entire surface is scraped to make it longitudinal and comfortable, and the road camber meets the design requirements. Do not drop the blade at the low-lying place, but scrape and sweep out the locally higher part, because there is no adhesive force between these materials and the lower layer, which is easy to cause peeling and crushing when rolling. The final leveling shall be carried out carefully. For local low-lying areas, no need to make up, but can be left for treatment when paving the asphalt surface course.
找平完畢后進行1-2遍碾壓,碾壓前如混合料表面風干,可用灑水車噴灑補水,以防壓不住。初壓時使用高幅/低頻振動模式,以便壓實層面的下部,隨后使用低幅/高頻振動模式壓實再生層的上部。碾壓時應先輕后重,自路邊向路中依次碾壓,碾壓速度應控制在低速度,注意錯輪寬度并且不漏壓。
After leveling, carry out 1-2 times of rolling compaction. If the surface of the mixture is dried before rolling compaction, spray water with a watering cart to prevent it from being crushed. The high amplitude/low frequency vibration mode is used for initial compaction to compact the lower part of the layer, and then the low amplitude/high frequency vibration mode is used to compact the upper part of the regeneration layer. The rolling shall be carried out from light to heavy, from the roadside to the middle of the road in turn, and the rolling speed shall be controlled at a low speed. Pay attention to the width of the staggered wheels and do not miss the rolling.
因為水泥的關系,在施工期間,從加水拌合碾壓成型灑水養(yǎng)護,不得超過4小時。以上就是為大家介紹的有關冷再生機的詳細的介紹,希望對您有所幫助。如果您有什么疑問的話,歡迎聯(lián)系我們http://m.gzmilo.com。
Due to the relationship between cement, during the construction period, from mixing with water to rolling and forming, watering and curing shall not exceed 4 hours. The above is a detailed introduction of the cold regenerator for you, and I hope it will help you. If you have any questions, please contact us http://m.gzmilo.com 。

閱讀/ Recommended reading

  冷再生機的操作規(guī)程是確保操作人員和設備的重要指導原則。以下是冷再生機操作規(guī)程的詳細內容:  The safety operating procedures for...

水泥撒布車的知識特點介紹 2025-02-28
冷再生機是一種、多用途的道路施工 2025-02-25
冷再生機:土壤穩(wěn)定路拌施工的優(yōu)選設備 2025-02-22
冷再生機液壓油的作用 2025-02-17

產品/ Recommended products