冷再生機組就位后的施工操作
來源:http://m.gzmilo.com/ 日期:2023-06-16 發(fā)布人:
對施工路段撒布外加材料,準備冷再生機械設(shè)備,包括水車、冷再生機、銑刨機以及瀝青罐車。將輸油管、輸水管進行準確連接。在機械設(shè)備連接完成后,對其使用性能進行檢查,再進行道路維修施工。
Spread additional materials on the construction section and prepare cold recycling machinery and equipment, including water tankers, cold recycling machines, milling machines, and asphalt tank trucks. Accurately connect the oil and water pipelines. After the mechanical equipment is connected, its performance should be checked before proceeding with road maintenance construction.
冷再生機租賃人員提醒您,當再生機到位后,綜合考慮道路工程維修路段的行駛速度要求,對舊路面進行翻松和冷破碎處理,并加入穩(wěn)定劑進行充分攪拌。
The leasing personnel of the cold recycling machine remind you that when the recycling machine is in place, taking into account the driving speed requirements of the road engineering maintenance section, the old road surface will be scarified and cold crushed, and stabilizer will be added for sufficient mixing.
在路面銑刨以及材料拌和過程中,應同時操作水車和再生機,確保水車處于空檔狀態(tài),在水帶作用下,與再生機進行連接,并對再生機注水,保證拌和所需水資源充足。
During the process of road milling and material mixing, both the water truck and the recycling machine should be operated simultaneously to ensure that the water truck is in neutral position. Under the action of the water hose, it should be connected to the recycling machine and injected with water to ensure sufficient water resources for mixing.
在拌和過程中,再生機應保持勻速、緩慢行進狀態(tài),對于再生施工速度,應控制在4~10m/min之間。
During the mixing process, the recycling machine should maintain a constant and slow speed, and the recycling construction speed should be controlled between 4 and 10m/min.
在行駛過程中,禁止突然提速或者減速,同時保證行駛過程勻速和連續(xù)性,在施工現(xiàn)場安排專人檢查再生機運行狀態(tài),對路面維修施工質(zhì)量進行檢查,及時發(fā)現(xiàn)問題并進行調(diào)整。
During the driving process, it is prohibited to suddenly increase or decrease speed, while ensuring a uniform and continuous driving process. A dedicated person is arranged on the construction site to check the operation status of the regeneration machine, inspect the quality of road maintenance construction, promptly identify problems and make adjustments.


此外在維修段路面橫向接縫處理中,加強冷再生機機械設(shè)備檢查和維修管理,避免在施工過程中出現(xiàn)停機問題。如果發(fā)生停機問題,并且停機時間較長,則當再生機重啟投入施工過程中,應將所有再生設(shè)備退再生施工完成的路段1.5m,然后再重新進行材料撒布和施工。
In addition, the inspection and Computerized maintenance management system of the mechanical equipment of the cold recycling machine should be strengthened in the treatment of the transverse joints of the pavement in the maintenance section to avoid Halting problem during the construction process. If there is a Halting problem problem and the shutdown time is long, when the regenerator is restarted and put into construction, all the regeneration equipment shall be returned to the section 1.5m where the regeneration construction is completed, and then the material spreading and construction shall be carried out again.
在縱向接縫處理中,如果縱向?qū)挾仍?m以內(nèi),并且縱向重疊部分比較多,則無法進行半幅施工,對此,可采用全幅施工方式,嚴格控制重疊量,提高施工質(zhì)量以及施工效率。
In the treatment of longitudinal joints, if the longitudinal width is within 7m and there are many overlapping parts in the longitudinal direction, half width construction cannot be carried out. Therefore, a full width construction method can be adopted to strictly control the overlapping amount, improve construction quality and efficiency.
通常情況下,對于重疊寬度,應控制在50~150mm之間,而如果相鄰兩次作業(yè)間隔時間在12h以上,則應適當增加重疊量。
In general, the overlap width should be controlled between 50 and 150mm, and if the interval between adjacent operations is more than 12 hours, the overlap amount should be appropriately increased.
在調(diào)頭處處理時,應確保機械設(shè)備處于已碾壓完成的路面,然后再調(diào)頭,并加強調(diào)頭作業(yè)段保護管理。對于需調(diào)頭的8~10m穩(wěn)定層上,應采用油氈紙或者塑料布進行覆蓋,然后再鋪厚度為10cm的土,后調(diào)頭并清理。還有什么事項就來我們網(wǎng)站http://m.gzmilo.com咨詢吧!
When handling at the turning point, it is necessary to ensure that the mechanical equipment is on the compacted road surface before turning around and strengthen the protection and management of the turning operation section. For the 8-10m stable layer to be turned around, linoleum paper or plastic cloth shall be used to cover it, and then 10cm thick soil shall be paved, turned around and cleaned. If there are any other matters, please come to our website http://m.gzmilo.com Consult!
閱讀/ Recommended reading
- 水泥撒布車的知識特點介紹 2025-02-28
- 冷再生機是一種、多用途的道路施工 2025-02-25
- 冷再生機:土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機液壓油的作用 2025-02-17
冷再生機操作規(guī)程
[2018-08-23]
冷再生機的操作規(guī)程是確保操作人員和設(shè)備的重要指導原則。以下是冷再生機操作規(guī)程的詳細內(nèi)容: The safety operating procedures for...