三级片在线观看网站,日韩美女操逼,在线播放国产色视频在线,女人毛片a毛片久久人人

冷再生施工和機械租賃業(yè)務(wù)
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心冷再生機施工進行碾壓時的五點操作
新聞中心
聯(lián)系我們
山東途暢路橋工程有限公司

聯(lián)系人:石總

電話:18264104888

地址:山東省濟南市槐蔭區(qū)經(jīng)一路273號群盛華城

冷再生機施工進行碾壓時的五點操作

來源:http://m.gzmilo.com/ 日期:2022-10-24 發(fā)布人:
在做好冷再生施工的過程中能夠節(jié)省很多的瀝清、沙石等原料的應(yīng)用,還能夠節(jié)約工程項目的時間步驟。那么冷再生機施工進行碾壓時的操作是怎樣的呢?冷再生機租賃廠家為您講解。
In the process of cold recycling construction, it can save a lot of raw materials such as asphalt, sand and gravel, and save the time and steps of the project. What is the operation of the cold recycling machine when rolling? The cold regeneration machine rental manufacturer will explain it to you.
(1)整形后,當混合料的含水量為佳含水量(+1%~+2%)時,應(yīng)立刻用壓路機在構(gòu)造層全寬內(nèi)停止碾壓。直線和不設(shè)超高的平曲線段,由兩側(cè)路肩向路中心碾時,應(yīng)堆疊1/2輪寬,后輪需超越兩段的接縫處,后輪壓完路面全寬時,即為一遍。普通需碾壓4~6遍。
(1) After shaping, when the moisture content of the mixture is good (+1%~+2%), the roller shall be used to stop rolling within the full width of the structural layer immediately. For straight lines and flat curved sections without superelevation, when rolling from the shoulders on both sides to the center of the road, 1/2 wheel width shall be stacked. The rear wheel shall exceed the joint of the two sections. When the rear wheel has finished rolling the full width of the road, it is one time. Generally, it needs to be rolled 4~6 times.
(2)嚴禁壓路機在已完成的或正在碾壓的路段上調(diào)頭或急剎車,應(yīng)保證改進土層外表不受毀壞。
(2) It is strictly forbidden for the roller to turn around or brake suddenly on the completed or rolling road section, and the surface of the improved soil layer shall not be damaged.
(3)碾壓過程中,水泥改進土的外表應(yīng)一直堅持潮濕,如水分蒸發(fā)過快,應(yīng)及時補撒少量的水,但嚴禁灑大水碾壓。
(3) During rolling, the surface of cement improved soil shall always be wet. If the water evaporates too fast, a small amount of water shall be sprinkled in time, but it is strictly prohibited to sprinkle large amounts of water for rolling.
冷再生機租賃
(4)經(jīng)過拌和、整形的水泥改進土,宜在水泥初凝前并應(yīng)在實驗肯定的延遲時間內(nèi)完成碾壓,并到達請求的密實度,同時沒有明顯的輪跡。
(4) After mixing and shaping, the cement improved soil should be rolled before the initial setting of cement and within the delay time confirmed by the experiment to reach the required compactness without obvious wheel tracks.
(5)在碾壓完畢之前,用平地機再終平一次,使其縱向順適,路拱和高契合設(shè)計請求。終平應(yīng)認真停止,需將部分高出局部刮除并掃出路外;關(guān)于部分低洼之處,不再停止找補,可留待下層施工時處置。
(5) Before the rolling is completed, the grader shall be used for final leveling again to make it smooth in the longitudinal direction, and the crown and height shall meet the design requirements. The final leveling shall be stopped carefully, and the part higher than the local level shall be scraped and swept away; Some low-lying areas will not be repaired and can be left for disposal during the construction of the lower layer.
冷再生機施工進行碾壓時的五點操作就講解到這里了,提醒您對此在使用過程中做好維護保養(yǎng)事項,以免出現(xiàn)問題影響設(shè)備質(zhì)量以及施工質(zhì)量!更多注意事項的了解就來我們網(wǎng)站http://m.gzmilo.com咨詢吧!
This is the end of the five points of operation during the construction of the cold recycling machine. We remind you to do a good job of maintenance during the use of this machine, so as to avoid problems affecting the equipment quality and construction quality! For more information, please come to our website http://m.gzmilo.com Consult!

閱讀/ Recommended reading

  冷再生機的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機操作規(guī)程的詳細內(nèi)容:  The safety operating procedures for...

水泥撒布車的知識特點介紹 2025-02-28
冷再生機是一種、多用途的道路施工 2025-02-25
冷再生機:土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
冷再生機液壓油的作用 2025-02-17

產(chǎn)品/ Recommended products