天氣冷之前的冷再生機(jī)可以這樣保養(yǎng)
來(lái)源:http://m.gzmilo.com/ 日期:2022-10-26 發(fā)布人:
天氣冷之前,冷再生機(jī)機(jī)械該如何進(jìn)行保養(yǎng)呢?下面冷再生機(jī)出租廠家從三個(gè)方面來(lái)為您進(jìn)行講解問(wèn)題。
How to maintain the cold regenerator machinery before the cold weather? The cold regeneration machine rental manufacturer will explain the problem from three aspects.
一、清洗外表
1、 Clean the surface
冷再生機(jī)在施工過(guò)程中會(huì)有大量的灰塵落到再生機(jī)的表面,包括施工中沾污的油跡等污染物,影響外觀事小,更為嚴(yán)重的是成為腐蝕的誘發(fā)因素。清洗工程機(jī)械的柴油機(jī)、底盤(pán)、工作裝置的外表,除垢、除油保持再生機(jī)的外觀整潔。清洗時(shí)嚴(yán)禁用高壓、高溫的水槍來(lái)沖洗防水要求較高的部位(特別是電器部分),以免造成電器部分的損壞。
During the construction of the cold regenerator, a large amount of dust will fall on the surface of the regenerator, including pollutants such as oil stains stained during the construction, which will have little impact on the appearance and, more seriously, become a corrosion inducing factor. Clean the appearance of the diesel engine, chassis and working device of the construction machinery, remove dirt and oil, and keep the appearance of the regenerator clean. It is forbidden to use high-pressure and high-temperature water gun to wash parts with high waterproof requirements (especially electrical parts) during cleaning, so as to avoid damage to electrical parts.
二、保養(yǎng)轉(zhuǎn)子及其罩殼和滑靴
2、 Maintain the rotor and its casing and slippers
1.檢查轉(zhuǎn)子是否有水泥結(jié)垢等,及時(shí)清理灰塵,對(duì)需要割除、焊接的刀具及時(shí)更換;
1. Check whether there is cement scaling on the rotor, clean up the dust in time, and replace the cutters that need to be cut and welded in time;
2.清理轉(zhuǎn)子罩殼上的灰塵,并在施工結(jié)束收車(chē)時(shí)將轉(zhuǎn)子罩殼墊起地面5-10公分,防止雨雪的浸蝕;
2. Clean the dust on the rotor housing, and pad the rotor housing 5-10 cm above the ground at the end of construction to prevent rain and snow erosion;
3.檢查滑靴,對(duì)已經(jīng)磨損的滑靴部分進(jìn)行補(bǔ)焊,螺紋處應(yīng)涂抹黃油防銹。
3. Check the sliding shoes, repair the worn sliding shoes, and apply grease on the threads to prevent rust.


三、減速機(jī)齒輪油的更換方式
3、 Replacement method of gear oil of reducer
1、場(chǎng)地:要求無(wú)塵硬化路面,面積應(yīng)在200左右,盡量是庫(kù)房,但要有足夠25噸的吊車(chē)的工作高度和半徑。
1. Site: It is required to have a dust-free and hardened pavement, with an area of about 200 square meters. It should be a warehouse as far as possible, but it should have enough working height and radius of a 25 ton crane.
2、設(shè)施:25噸吊車(chē)一臺(tái)(20噸也可以)。
2. Facilities: One 25t crane (20t is also acceptable).
3、配件:進(jìn)口美孚齒輪油9升、衛(wèi)生紙10卷、塑料帶20個(gè)、廢油桶2個(gè)、緊固膠262/340一支、密封膠587一支、黃油一袋,細(xì)線繩20米、12*45的帶母螺栓30套、4*30開(kāi)口銷(xiāo)10個(gè)。
3. Accessories: 9 liters of imported Mobil gear oil, 10 rolls of toilet paper, 20 plastic belts, 2 waste oil drums, a piece of fastening glue 262/340, a piece of sealant 587, a bag of butter, 20 meters of string, 30 sets of 12 * 45 bolts with nuts, and 10 4 * 30 cotter pins.
4、工具:10、16、18、19、21、22、24、30套筒和扳手少一套、快速扳手及長(zhǎng)、短接桿各一、加力桿一根、30的輪胎扳手、10毫米的內(nèi)六角扳手、55的活口扳手兩把、小號(hào)活口扳手一把、小號(hào)的老虎鉗一把、手鉗一把、一字螺絲刀一把、大小錘頭各一、撬棍兩根,配備氣動(dòng)扳手和氣泵,能提高工作效率。
4. Tools: at least one set of 10, 16, 18, 19, 21, 22, 24, 30 sockets and wrenches, one quick wrench and one long and short connecting rod, one booster rod, 30 tire wrench, 10 mm hexagonal wrench, two 55 open-end wrenches, one small open-end wrench, one small vise, one hand clamp, one flat screwdriver, one large and small hammer head, two crowbars, equipped with pneumatic wrench and air pump, can improve the working efficiency.
(減速機(jī)油位及減速機(jī)油的檢查:先切斷電源,等待減速機(jī)冷卻后打開(kāi)放油螺塞,檢查油是否充滿(mǎn),避免漏油,取油樣,檢查油色澤及粘度指數(shù),如果油明顯渾濁,建議盡快更換。新減速機(jī)使用后(500-1000)小時(shí)更換新油(將內(nèi)部污油沖干凈),其后每使用1500小時(shí)需要更換油一次,但是在使用過(guò)程中,仍需要檢查油的質(zhì)量,若油有老化、變質(zhì)情況要隨時(shí)更換。)
(Inspection of reducer oil level and reducer oil: first cut off the power supply, wait for the reducer to cool down, then open the oil drain plug, check whether the oil is full, avoid oil leakage, take an oil sample, check the oil color and viscosity index, if the oil is obviously turbid, it is recommended to replace it as soon as possible. After the new reducer is used (500-1000) hours, replace the new oil (flush the internal dirty oil), and then replace the oil every 1500 hours, but during the use process, It is still necessary to check the quality of the oil. If the oil is aged or deteriorated, it should be replaced at any time.)
天氣冷之前的冷再生機(jī)的保養(yǎng)就是以上內(nèi)容了,您對(duì)此還有什么方面不理解的,可以隨時(shí)來(lái)我們網(wǎng)站http://m.gzmilo.com進(jìn)行咨詢(xún)!
The above is the maintenance of cold regeneration before the cold weather. If you don't understand anything about it, you can come to our website at any time http://m.gzmilo.com Consult!
閱讀/ Recommended reading
- 水泥撒布車(chē)的知識(shí)特點(diǎn)介紹 2025-02-28
- 冷再生機(jī)是一種、多用途的道路施工 2025-02-25
- 冷再生機(jī):土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機(jī)液壓油的作用 2025-02-17
冷再生機(jī)操作規(guī)程
[2018-08-23]
冷再生機(jī)的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機(jī)操作規(guī)程的詳細(xì)內(nèi)容: The safety operating procedures for...