冷再生機(jī)“液壓系統(tǒng)”的更換與保養(yǎng)
來源:http://m.gzmilo.com/ 日期:2022-11-30 發(fā)布人:
冷再生機(jī)的使用不僅可以節(jié)約能源和資源,降低材料、人工費(fèi),節(jié)省運(yùn)輸費(fèi),對(duì)于施工又可以延長施工季節(jié),幾乎不受陰濕或低溫季節(jié)影響。下面冷再生機(jī)租賃人員為您講解下冷再生機(jī)“液壓系統(tǒng)”的更換與保養(yǎng)。
The use of the cold regenerator can not only save energy and resources, reduce material and labor costs, save transportation costs, but also extend the construction season for construction, almost not affected by wet or cold seasons. The rental personnel of the cold regenerator will explain the replacement and maintenance of the "hydraulic system" of the cold regenerator.
更換條件及標(biāo)準(zhǔn):
Replacement conditions and standards:
冷再生機(jī)在施工過程中負(fù)荷較大、液壓系統(tǒng)溫度較高,為使泵和馬達(dá)等液壓元件系統(tǒng)中的液壓油黏度處于佳范圍,建議用戶使用HV46#及以上低溫冷凝抗磨液壓油。
During the construction of the cold regenerator, the load is large and the temperature of the hydraulic system is high. In order to keep the viscosity of the hydraulic oil in the pump, motor and other hydraulic component systems within a good range, users are recommended to use HV46 # and above low-temperature condensate anti-wear hydraulic oil.
根據(jù)工程機(jī)械設(shè)備對(duì)液壓系統(tǒng)的要求,初次對(duì)液壓系統(tǒng)和濾芯的保養(yǎng)為500小時(shí),考慮油質(zhì)及費(fèi)用問題,初次保養(yǎng)方案是將油品進(jìn)行過濾,只更換濾芯;從二次保養(yǎng)開始為1000h,因工作強(qiáng)度的大小不一樣,可以根據(jù)油脂情況適當(dāng)延長保養(yǎng)時(shí)間。
According to the requirements of engineering machinery and equipment for the hydraulic system, the initial maintenance of the hydraulic system and filter element is 500 hours. Considering the oil quality and cost, the initial maintenance plan is to filter the oil and only replace the filter element; 1000h from the second maintenance. Due to different working intensity, the maintenance time can be extended according to the grease condition.
若設(shè)備運(yùn)轉(zhuǎn)使用不足1000小時(shí),因工作強(qiáng)度一般可不更換全部液壓油,但需要放出樣品,看顏色是否清亮,手感粘度是否可以,可采用過濾全部液壓油后更換全部濾芯的方式進(jìn)行保養(yǎng)。
If the equipment has been operated for less than 1000 hours, it is generally not necessary to replace all the hydraulic oil due to the working strength, but it is necessary to discharge the sample to see whether the color is clear and the hand viscosity is acceptable. The maintenance can be carried out by filtering all the hydraulic oil and replacing all the filter elements.


保養(yǎng)方案:
Maintenance plan:
①更換時(shí)機(jī):設(shè)備運(yùn)轉(zhuǎn)結(jié)束后適當(dāng)?shù)臏囟认拢?0攝氏度以下)更換為佳時(shí)機(jī)。
① Time for replacement: The best time for replacement is at an appropriate temperature (below 50 ℃) after the equipment operation.
②更換液壓油及濾芯應(yīng)具備的場(chǎng)地條件及器具。
② The site conditions and instruments required for replacing hydraulic oil and filter element.
場(chǎng)地條件:平整清潔的地面(水泥地面好)。
Site conditions: flat and clean ground (good cement ground).
器具:三相電源、200L的油桶三個(gè)、濾油機(jī)一臺(tái)(更換濾芯)、充足的液壓油(HV46#)、濾芯一套、濾芯扳手1件。
Appliance: three-phase power supply, three 200L oil drums, one oil filter (filter element replacement), sufficient hydraulic oil (HV46 #), one set of filter element, and one filter element wrench.
③更換步驟:先將設(shè)備的液壓油抽出。拆下全部液壓油濾芯。將事先需要更換的鋼管、膠管安裝好。將新液壓油通過濾油機(jī)注入。觀察新的油位是否達(dá)到標(biāo)準(zhǔn)油位,直到達(dá)標(biāo)為準(zhǔn)。啟動(dòng)設(shè)備后,小負(fù)荷運(yùn)轉(zhuǎn)設(shè)備,使液壓油均勻充滿各部位液壓件。
③ Replacement steps: first draw out the hydraulic oil of the equipment. Remove all hydraulic oil filter elements. Install the steel pipes and rubber hoses that need to be replaced in advance. Fill new hydraulic oil through the oil filter. Observe whether the new oil level reaches the standard oil level until it reaches the standard. After starting the equipment, operate the equipment with small load to make the hydraulic oil evenly fill all parts of the hydraulic parts.
冷再生機(jī)“液壓系統(tǒng)”的更換與保養(yǎng)常識(shí)內(nèi)容講解完畢了,希望能夠給您好的幫助,當(dāng)然您在使用設(shè)備之前建議了解好相關(guān)的正確的操作事項(xiàng),保障后期的項(xiàng)目質(zhì)量。關(guān)注我們網(wǎng)站http://m.gzmilo.com,了解更多事項(xiàng)!
The common sense of replacement and maintenance of the "hydraulic system" of the cold regenerator has been explained. I hope I can help you. Of course, before using the equipment, you are recommended to understand the relevant correct operation matters to ensure the project quality in the later period. Follow our website http://m.gzmilo.com , learn more!
閱讀/ Recommended reading
- 水泥撒布車的知識(shí)特點(diǎn)介紹 2025-02-28
- 冷再生機(jī)是一種、多用途的道路施工 2025-02-25
- 冷再生機(jī):土壤穩(wěn)定路拌施工的優(yōu)選設(shè)備 2025-02-22
- 冷再生機(jī)液壓油的作用 2025-02-17
冷再生機(jī)操作規(guī)程
[2018-08-23]
冷再生機(jī)的操作規(guī)程是確保操作人員和設(shè)備的重要指導(dǎo)原則。以下是冷再生機(jī)操作規(guī)程的詳細(xì)內(nèi)容: The safety operating procedures for...